15
KEOR S 3-10 kVA
Oper
ating & I
nstalla
tion M
anual
5.2
. Unpacking Procedure
Figure.5.2-1
Figure.5.2-3
Figure.5.2-5
Figure.5.2-2
Figure.5.2-4
Figure.5.2-6
Remove the wrap and the package.
Screw off the stop plates placed at the front and back of UPS. Remove the stop plate
Unload the UPS via wheels over the ramp. Place UPS in the installation area.