43
5.3 System work status display
The system work status includes: initializing, shut down, exit parallel system, maintenance bypass output,
bypass output, battery inverter output, mains inverter output, grid-connected aging, ECO bypass output,
frequency conversion inverter output, aging bypass output, fault protection. Each page is as shown from
Figure 5-3 to Figure 5-14.
Figure 5-3. Initializing
Figure 5-4. Shut down
Figure 5-5. Exit parallel system
Figure 5-6. Maintain bypass output
Figure 5-7. Bypass output
REC.
BYPASS
MAINS
BATT.
INV.
OUTPUT
Output:
Initializing
2017.12.12 20:06:12
P-U(V) P-V(V)
P-W(V)
Freq.(Hz)
0.0
0.0
0.00
0.0
REC.
BYPASS
MAINS
BATT.
INV.
OUTPUT
Output:
Shutdown
2017.12.12 20:06:12
P-U(V) P-V(V)
P-W(V)
Freq.(Hz)
0.0
0.0
0.00
0.0
REC.
BYPASS
MAINS
BATT.
INV.
OUTPUT
Output:
Exit Parallel Sys.
2017.12.12 20:06:12
P-U(V) P-V(V)
P-W(V)
Freq.(Hz)
0.0
0.0
0.00
0.0
REC.
BYPASS
MAINS
BATT.
INV.
OUTPUT
Output:
Maintain Byp. Output
2017.12.12 20:06:12
P-U(V) P-V(V)
P-W(V)
Freq.(Hz)
0.0
0.0
0.00
0.0
REC.
BYPASS
MAINS
BATT.
INV.
OUTPUT
Output:
Bypass Output
2017.12.12 20:06:12
P-U(V) P-V(V)
P-W(V)
Freq.(Hz)
0.0
0.0
0.00
0.0