background image

3

No: IS-00711 – Rev. A

Press and hold here on

front, bottom center

Set 1/16” hex screw

in station bottom

1/16” HEX

A

B

C

INSTALLATION OVERVIEW

EQUINOX 41-LCAP STATION INSTALLATION STEPS

1. 

Run PoE Ethernet bus to four square junction box

2.

 Install ring with screws provided (figure 

A

)

3.

 Connect RJ45 to station

4.

 Install sta

tion by rotating (figure 

B

) and connecting the top first. 

    Press station in and hold on bottom center while securing the hex 

    screw with provided allen wrench (figure 

C

)

*Ethernet Bus: 

Power and communication; Ethernet, PoE or PoE+, (Optional) - Ethernet 4 Port PoE Injector (part# DA2400)

EQUINOX 41-LCAP

TOUCHSCREEN

NETWORK PANEL

OR SWITCH

ETHERNET PoE or PoE+

Harv...

Open

Rest Ge...

PoE/PoE+

ETHERNET BUS

SCREWS*

*Use flat-head

screws provided

US – 6-32 x 0.75”

RJ45 CONNECTOR

4 SQUARE JUNCTION

BOX RING

EQUINOX 41-LCAP

LCD SCREEN

Summary of Contents for Wattstopper EQ41-LCAP

Page 1: ...er Ethernet PoE or PoE PoE optional Ethernet 4 Port PoE Injector part number DA2400 or COM POE SWITCH Communicates over Ethernet via Ethernet Bus Firmware upgradeable over Ethernet from Design Center Built in ambient light sensor for Active AUTO mode screen brightness Built in proximity activation 6 maximum may be programmed to execute a task with a hand wave across front of station Dual operation...

Page 2: ...on Yes Maximum Gangs Single gang only LCD Button Status Automatic white off orange on Mounting US European style single gang wall boxes or low voltage brackets Addressing Self addressing through software Finish Trim Titanium Touchscreen Black glass Glass Surface Chemically strengthened Ambient Operating Temperature 32 95 F 0 35 C Ambient Operating Humidity 5 95 non condensing CE FCC Compliant Yes ...

Page 3: ...tall station by rotating figure B and connecting the top first Press station in and hold on bottom center while securing the hex screw with provided allen wrench figure C Ethernet Bus Power and communication Ethernet PoE or PoE Optional Ethernet 4 Port PoE Injector part DA2400 EQUINOX 41 LCAP TOUCHSCREEN NETWORK PANEL OR SWITCH ETHERNET PoE or PoE Harv Open Rest Ge PoE PoE ETHERNET BUS SCREWS Use ...

Page 4: ...ed 1 First Time Setup Click on Create Admin Password to establish a custom password Using the keyboard type in a password and press check to confirm 2 Once the Admin Password is established press Initialize System to access the current default view with all on all off control 2 About Discover information about the Equinox 41 LCAP including serial number part number and application edition Also ide...

Page 5: ... color and font size settings for optimal viewing 5 Areas and Rooms Manage areas by selecting an area to adjust its name access included scenes favorites room presets and startup location If rooms and partitions have previously been established in Design Center further customize each area including partitioned areas within this setting Settings Access and Permissions Administrator Add New User Rol...

Page 6: ...evices Lights Shades Settings Devices Lights Shades Area1 Area1 New Partition Left Left Settings Area1 Lights Shades Load 1 Load 2 Load 3 Load 3 Load 3 Load 3 Settings Edit Light Name Access Load 1 Schedules Select Users Edit Settings Edit Event Event Name Scheduled Recurrence Required Every hour 0 Action None 8 Events An event starts a scene at a specific time and or date interval hourly daily we...

Page 7: ...ateway or DNS Server addresses 11 Repair Check status of items needing repair Create and manage categories to your specific project Second and third levels allow creation and management of load and shade groups Settings Project Add New Category Categories Settings Name Category Scenes Project Manage Categories Settings Network Settings 192 168 5 107 255 255 255 0 Netmask 192 168 5 1 Gateway DNS Se...

Page 8: ...n actions that are available to your system Settings Scenes Add New Scene Settings Edit Scene Scene Name Actions Required Edit Rooms Manage WIDGETS OVERVIEW Program complete system control including shades lighting home scenes and divide combine For detailed information about all widgets and settings refer to the widget instructions install pdf on the dealer site Shades Lighting Default Scenes 12 ...

Page 9: ...is 3 ans Les écrans tactiles sont garantis pendant 90 jours Wattstopper ne peut être tenu responsable de tout dommage consécutif causé par ou lié à l utilisation ou à la performance de ce produit ou tout autre dommage indirect lié à la perte de propriété de revenus ou de profits ou aux coûts d enlèvement d installation ou de réinstallation Wattstopper garantiza que sus productos están libres de de...

Reviews: