28
5.
See Fig. 4
. Install left and right lower mount-
ing bolts to secure frame using (2) M8x1.25x30
GR 8.8 hex flange bolts.
•
(2) M8 x 1.25 x 25 Flange Bolts– CB1920
6. Drill out lower frame holes on tour pack frame
to 11/32”.
7.
See Fig. 5.
Install upper tour pack frame bolts
and tour pack frame: top holes use M8 x 50mm
flange bolts and original M8 flanged nuts; bot-
tom holes-use original top tour pack M8 x 40
bolts. Torque bolts to
18 ft.-lbs
.
•
(2) M8 x 50 Flange Bolt– CB1923
•
(2) M8 Flange Nuts– OEM
•
(2) M8 x 40 Flange Bolts– OEM
8.
See Fig. 4
. Torque front frame mounting hard-
ware to
22 ft. lbs.
Once front trike frame hard-
ware is secure, remove upper tour pack frame
hardware and remove tour pack frame from
trike until after the body is installed.
9.
See Fig. 6
. Attach reverse resistor to frame on
left side side using the original mounting hard-
ware.
10. Connect electrical connectors and battery feed.
Fig. 4
Fig. 5
Upper tour pack frame bolts
Fig. 6
Reverse resistor
Lower mounting bolts
FRAME INSTALLATION