48
PROCEDURE GOOD
RE-WORK
1.
Reflectors installed (if applicable)
□
□
2.
Lights and horn work
□
□
3.
Park brake operation
□
□
4.
Engine/Transmission oil levels
□
□
5. Wheel
torque
85ft. lbs (75ft. lbs-wire)
□
□
6.
Rear tire pressure
26 psi
□
□
7.
Front tire pressure
36 psi
□
□
8.
Trunk latch on right handle of tour pack
□
□
9.
Trunk clean and dry
□
□
10.
Trunk door seals and operates smoothly
□
□
11.
Honda shock set @ 13
□
□
12.
Auxiliary shock set @ mid setting
□
□
13.
Heat shields/Side covers
□
□
14.
Monarch II/Lehman badge installed
□
□
15.
Accessories (if applicable)
□
□
16.
No paint defects
□
□
17.
Warranty/Owners manual with trike
□
□
FINAL INSPECTION