DELTA
Installation Manual
Edition July 2013
DELT
∆
∆
∆
∆
platform lift
page 9 of 24
Use this screw for fixing the
overspeed governor
Lever to trigger the
overspeed governor
Step 7:
Open the upper and lower frontal covers
of the carriage. At delivery of the unit the upper
carriage will be moveable (can rotate). This will
facilitate the process of engaging the platform
onto the rails. After engaging the platform the
upper carriage has to be fastened – see below.
Adjust the upper carriage to the same angle as
the lower carriage and the rail.
Note:
After adjusting the angle of the upper
carriage, fix the four nuts of the upper carriage.
This
must not
be forgotten!!!
Step 8:
Run the carriage once up and down on
the railway and check if the overspeed governor
is adjusted well. There should be a constant gap
between the rack and the guide holes in the
overspeed governor. If not adjust the overspeed
governor by loosening the fixing screw.
Step 9:
Reinstall the charging ramp and the clams for
unblocking of the barrier arms to the upper end of the
railway. Reinstall all covers on the carriages.