DELTA
Installation Manual
Edition July 2013
DELT
∆
∆
∆
∆
platform lift
page 19 of 24
Dismantle the platform floor
•
Dismantle the ball bearing connection between sliding mechanism and platform
•
Disconnect platform rod connection for sidewall
•
Dismantle safety under-pan of the platform
•
Disconnect spring inside platform floor. You might need to manually compress the
spring in order to uninstall the connection. Make sure that the connection between
the spring and the bearing is correctly put together afterwards. The connection
metal parts have a slight bend. It is important for reassembly that they are put back
in the same way.
•
Disconnect the electrical wiring between the platform floor and the sidewall
•
Disconnect fixing screw from the treaded pinhole of main platform hinge bearing
•
Remove the main bearing pin and take off the platform floor
Take out main
bearing pin
Disconnect spring
Disconnect platform rod
Loosen ball bearing
Take out spring
Disconnect fixing
screw and wiring
Bend in metal part