Step 3:
First fix the upper bracket to the wall or to the upper pillar (pillars have the serial
letters stamped on the base). The required dimensions for the first fixing point are given in
the drawing – see dimension X1 and Y1 in example drawing below:
Step 4:
Adjust the correct angle of the rail. Now check the necessary clearance
(dimensions D in illustration) between the lower rail and the step noses. In case the rail
angle must be changed to get the correct clearance between rail and step then the angle
of the lower platform carriage needs to be changed.
Step 5:
If the actual measurements correspond with the clearance dimensions on the
layout drawing fix the remaining brackets to the walls or to the pillars.
Step 6:
Clean any debris from the rails