Liftboy 1/2/3 Handbook
Stand 01/2019
Liftboy 1/2/3
Plattform Lift
Seite 6 of 10
Fixing of the rail on actuator side
1. The assembly screws are pre-assembled on the upper board. They will be
screwed off.
2. The safety rail will be mounted on the upper board. The screws will be tightened.
End caps
1. Have to be mounted on the ends of the small safety rails.
Handheld controller
1. The handheld will be put on the rail.
2. The connector will be mounted in the connector bushing in the safety rail.
3. The connector is waterproof.
Transformer
1. The connector of the transformer will be connected to the connector at the
platform.
2. The power plug has to be connected to the supply network system. Put on the
current.