2020-02
CANVASA II + II can filling machine operating manual
36
Manual operation II
High-pressure injection
Forward/backward stroke of the high-pressure injection
nozzles
CO2 pre-gassing
Actuates the valve for pre-gassing to set the flow rate for
10 seconds
Bubble breaker
Actuates the valve for the bubble breaker to set the flow
rate for the duration saved in product management
Bottom lid gassing
Actuates the valve for bottom lid gassing to set the flow
rate for 10 seconds
Blow off chuck
Blows compressed air into the vacuum line to blow it free
when required
Can spray
Actuates the valve for the can spray for as long as the
button is pressed
Blow-off cans
Actuates the valve to blow of the lid as the button is
pressed
Manual operation
High-pressure in-
jection
(10s) CO2 pre-
gassing
BACK
Menu
Bubble breaker
(10 s) Bottom lid
gassing
Blow off chuck
Rinser water
Rinser cylinder
Can feed
Blow-off cans
Can spray
Can turner
Can barrier
Printer