2020-02
CANVASA II + II can filling machine operating manual
75
Daily maintenance (every 8 operating hours)
Cleaning of the complete machine. Removal of all fragments and other impurities.
Visual inspection of the control panel. Immediately replace damaged or non-functional ele-
ments.
Flushing the media-carrying components.
Visual inspection of all contact rubbers on the filling valves for intactness. Immediately re-
place defective sealing rubbers.
Visual inspection of all filling pipes for intactness. Straighten bent filling pipes or replace dam-
aged filling pipes
Weekly care (every 40 operating hours)
Check the exact centering of the can under the sealer and reset the zero point if necessary.
Yearly care (every 2000 operating hours)
In addition to the work listed under "Monthly care", the following work must be performed annually
(every 2000 operating hours).
Check drive including gear motor, toothing and torque support.
Gear oil change as per the manufacturer's instructions.
Check all bearings.
Check all mechanical and electrical devices for correct functioning.
Additionally with filling and sealing machines:
Replace fill valves, centering bells, lifting elements, sealing cylinder, damaged seals/wear
parts.