Page 36
Transport/Start up
Group 5
Release R1.12 en
JET2 neo
Installation of print head
During an installation of a device in a production line, the operating staff
should be not endangered. Due to moving products under the print head
danger of bruising and shearing can be caused. The regulations of the
machinery directives should be observed!
5.4 Starting
(Commissioning)
For a safe transport some hydraulic components are supplied with transportation protection
(cable ties) and the reservoir tanks are evacuated. The following steps have to be carried out
before the initial operation
Remove the transportation protection (cable ties) (Step 1)
Fill the reservoir tank (Step 2)
Carry out the function
<Fill up routine>
(Step 3).
5.4.1 Remove transportation safety devices (Step 1)
The pumps of the hydraulic system are secured with cable ties. These
have to be
absolutely removed.
Proceeding:
Dismantle the back cover of the hydraulic cabinet (1) by loosing the fixing screws (2).
Attention!
The cable tie at the main filter (3) should not be removed!
Remove the transportation protection (cable ties).
Now attach the back cover of the hydraulic cabinet again with the according fixing
screws.
Summary of Contents for JET2 neo
Page 1: ...Manual LEIBINGER JET2NEO Release 1 12en ...
Page 2: ......
Page 11: ...Group 1 Table of contents Page 9 JET2 neo Release R1 12 en ...
Page 12: ......
Page 21: ...Group 2 Safety Page 19 JET2 neo Release R1 12 en 2 4 Safety sticker Figure 1 Safety sticker ...
Page 276: ...Page 274 Appendix Group 12 Release R1 12 en JET2 neo Interface X4 Inputs Interface X3 Outputs ...