ProVision 3 Installation Manual
8100-35521-00
Rev. A1
Leidos Security Detection & Automation, Inc.
–
Proprietary
Page 46 of 119
© 2020 Leidos. All rights reserved
Figure 42: Bolt-On Side Frames
Figure 43: U-clip Installed on Frame
5.
Repeat for the other frame along the other side.