ProVision 3 Installation Manual
8100-35521-00
Rev. A0
Leidos Security Detection & Automation, Inc.
–
Proprietary
Page 96 of 119
© 2020 Leidos. All rights reserved
Figure 105: Barcode Label Above Block
13.
Check if the foam blocks are properly installed when the mast comes to its end of travel or is at
start of travel, the foam blocks should be softly touching the front corner edge of the mast. See
top down view in Figure 106.
Figure 106: Top Down View
14.
If the foam blocks are touching correctly, replace the components removed to access the inner
endcaps.
15.
Verify AIT-2 is working properly.
Add foam block
P/N label