14
Play Deck Model 5010 • 09-1209
Items needed for this phase:
Hardware needed for this phase:
Lag Screw * 5/16" x 2" * 8 Req
Wood Screw * #8 x 1-1/8" * 24 Req
Fender Washer * 5/16" x 11/16" * 8 Req
Internal Tooth Lock Washer * 5/16" – 19/32" OD * 8 Req
N4 * Arch Top Rail * 2 Req
P9 * Wall Board * 6 Req
Step 20
: Attach the
P9s
to the inside of the N6s and the P5s with 1-1/8" wood screws. The P9s should be
3-3/16" apart, and they should be attached 1-1/4" from the bottom of the N6s.
Step 21
: Attach the
N4s
fl ush to the E1s and the E2s with 2" lag screws, lock washers, and fender washers.
The N4s should be aligned with the N6s.
Phase 7: Wall Assembly
The N4s should be aligned with the N6s.
14
P9s
P9s
N4
N4
N6
N6
P5
P5
E1
E1
E2
E2
N6
N6
1-1/4"
3-3/16"