© Copyright Playground Inc
Pilot drill with 3/16" bit using holes in
G1 as guide and attach the G1
Beam
Ground Board
to the assembly using
four 2" Lag Screws, Lock Washers
and Washers
.
The Ground Board will
overhang the E1 boards, as shown in
the inset illustration.
Tighten securely,
but do not over tighten.
Pilot drill using 3/16" bit and holes in
E2 as guide and attach the E2
Beam
End Support
E2 to the assembly
using two 3" Lag Screws, Lock
Washers and Washers in the center
holes into B1 and two 2-1/2” Lag
Screws, Lock Washers
and Washers
into the E1 boards
.
Tighten securely,
but do not over tighten.
(G1 ) Beam Ground Board * 4 Holes * 1 x 5-1/2 x 89
5/16 X 2"
LAG
SCREW
5/16"
INTERNAL
TOOTH
LOCK
WASHER
5/16"
FLAT
WASHER
( E2 ) Beam End Support * 4 Hole * 1-1/2 x 3-1/2 x 40-3/4
3"
2½"
2½"
5/16 X 2-1/2"
LAG
SCREW
5/16 X 3"
LAG
SCREW
NOTE HOW THE
ANGLED FACE OF
B1 IS FACING UP
FOR THESE TWO
STEPS.
STEP 6
STEP 5
E1
G1
E1
E1
E2
B1
E1
E1