G4
M5
H6
C2
C2
STEP 9
Using the pre-drilled holes in the G4 Club House Wall Rail as a guide, drill
thru the Wall Boards using a 3/8” drill bit. Install four 5/16” Spiked T Nuts,
from the inside of the Tower, into these holes.
Turn over the Swing Beam Assembly, stand it up, and line up the holes in
the
Y16
Swing Beam Mount to the holes in the G4 Club House Wall Rail.
Attach the Swing Beam Assembly to the Tower using four 2” Hex Bolts,
Lock Washers and Flat Washers through the
Y16
Swing Beam Mount and
G4 Rail. Tighten securely, but do not over tighten.
5/16” x 2” HEX HEAD BOLT
FLAT
WASHER
BOLT
LOCK
WASHER
BO
ARD
FLAT
WASHER
BARREL
NUT
5/16"
Metal stake installation: measure in 8” from outside edge
of G1 ground board for ground for stake location. Now
attach the stakes to G1 Ground Board using 1” Phillips
Truss Head Bolt, two Flat Washers, Lock Washer and
Barrel Nut Per Diagram at right. You will need a long
screwdriver for leverage. In some cases you may need
to dig a hole to install stake and cement.
STEP 10
STEP 11
Hang the Swings and Trapeze with this simple procedure:
• Put all the chains on the
Carabiners Y5
.
• Hang the Swings and Trapeze as shown below
• Slip the Plastic Safety
Tubes Y6
on the Carabiner.
Y6
Y5