Page 30
Step 32
Attach
B8 Swing Beam Mount
to B7,
B6 and B2 using 3/8 x 6” Hex bolts,
3/8” Lock Washers, 3/8 Flat Washers,
and 3/8” Spike T-Nuts.
Note: Insure you have a 5 3/8”
opening from top of B8 and notch
in K19.
B1
K19
B7
B6
B8
Step 33
Finish attaching B6 Corner Post to Floor with Y30-40G L
Bracket on back of Post. Drill Floor with 3/8” bit and secure
with ¾” Phillips Truss Head Bolt, 5/16” Lock Washer, and
Barrel Nut with 5/16” Lock Washer and Flat Washer. Attach
Y30-40G L Bracket to Post with 5/16 X 1 ½” Lag Screw,
Lock Washer and Flat Washer. (per diagram)
Pilot drill B6 Post with 3/16” bit and attach.
Step 34
Attach
K2 Roof Support Rails
to B5 and B7
and to B4 and B6 with 5/16 X 3 ¾” Hex Bolt,
Lock Washer, Flat Washer and Spike T-Nuts.
K2
K2
B6
B1
B1
B6
B2
B4
K2 - Roof Support Rail - 4 Holes - 2 Required
.9375 x 3.375 x 67 [2.38 x 8.57 x 170.18]
B8 - Swing Beam Mount - 4 Holes - 1 Required
3 x 3 x 50.375 [7.62 x 7.62 x 127.95]
3/8 X 6"
HEX
HEAD
BOLT
3/8
INTERNAL
TOOTH
LOCK
WASHER
"
3/8" FLAT
WASHER
5/16"
INTERNAL
TOOTH
LOCK
WASHER
5/16" FLAT
WASHER
5/16"
SPIKE TEE
NUT
3/8"
SPIKE TEE
NUT
5/16 X 3 3/4"
HEX
HEAD
BOLT
5/16 X 1 1/2"
LAG
SCREW
1/4"
BARREL
HEAD
NUT
1/4 X 3/4"
PHILLIPS
TRUSS
HEAD
BOLT
B2
Y30-40G
FLAT
WASHER
LOCK
WASHER
BARREL
NUT
BOLT
FLOOR
FLAT
WASHER
© Copyright Leisure Time Products Inc.
Sky Fort 09-0112
2" x2" METAL
BRACKET
Y30-40G
5 3/8”
6”
6”