Page 32
Step 38
Attach
K13 Clubhouse Wall Rail
to P22 Wall Rail
placing 5/16” x 1 ¾” Hex Bolt, Lock Washer and Flat
Washer through Y30-40G L Bracket and fasten to
P22 with Spike T-Nut. (per diagram). Use Y30-40G
as guide and drill floor board with 3/8” drill bit and
attach to floor with 1/4” x 3/4” PTHB 5/16” Washer
and barrel nut with 5/16” Lock Washer.
Level K13 up and down and fasten to K7 with 1 ½”
Wood Screw.
B5
P22
B7
K13
K13
P22
Step 39
Attach
P2 Top Wall Rail
to B7, B6 and
B1 on top of Floor with 5/16” X 1 ½” Lag
Screws, Lock Washers and Flat
Washers.
B7
B1
Step 40
Attach
K9 Clubhouse Wall Rail
to
B5 and B4 flush with K2 roof support
Rails with 5/16 X 2” Lag Screws,
Lock Washers and Flat Washers.
K9
B4
B5
K13 - Club House Wall Rail - 3 Holes - 1 Required
.9375 x 3.375 x 28.625 [2.38 x 8.57 x 72.71]
K9 - Club House Wall Rail - 4 Holes - 1 Required
.9375 x 3.375 x 50.375 [2.38 x 8.57 x 127.95]
P2 - Top Wall Rail - 5 Holes - 1 Required
.625 x 3.375 x 80 [1.59 x 8.57 x 203.20]
P2
B6
K7
K7
K2
K2
5/16 X 1 3/4"
HEX
HEAD
BOLT
5/16 X 1 1/2"
LAG
SCREW
5/16 X 2"
LAG
SCREW
5/16"
INTERNAL
TOOTH
LOCK
WASHER
5/16" FLAT
WASHER
5/16"
SPIKE TEE
NUT
#8 X 1-1/2"
WOOD
SCREW
1/4"
BARREL
HEAD
NUT
1/4 X 3/4"
PHILLIPS
TRUSS
HEAD
BOLT
FLAT
WASHER
LOCK
WASHER
BARREL
NUT
BOLT
FLOOR
K13
FLAT
WASHER
© Copyright Leisure Time Products Inc.
Sky Fort 09-0112
Y30-40G
Y30-40G
2" x2" METAL
BRACKET
Note: pilot drill with 3/16” bit.
Note: pilot drill with 3/16” bit.