Page 33
Step 41
Attach
H8 Clubhouse Wall Rail
to
B7 and B6 flush with bottom of K2
Rails with 5/16 X 2” Lag Screws, Lock
Washers and Flat Washers.
B7
K2
K2
Step 42
Attach
E7 Clubhouse Leg
to K5 Rail with
5/16 x 2” Hex Bolt, Lock Washer, Flat
Washer and Spike T-Nut. Level E7 up
and down both ways. Place Y30-40G L
Bracket against inside of E7 and mark
Floor Board. Drill through Floor Board
with 3/8” drill bit and attach Y30-40G L
Bracket to Floor with ¾” Phillips Truss
Head Bolt, 5/16” Washer and 5/16” Lock
Washer on Barrel Nut.
E7
K5
E7
B1
B1
B4
B6
Step 43
Now finish attaching E7
to Y30-40G L Bracket
with 5/16” x 1 ½” Lag
Screw, Lock Washer
and Flat Washer.
H8 - House Wall Rail - 6 Holes - 1 Required
.9375 x 5.375 x 50.375 [2.38 x 13.65 x 127.95]
E7 - Club House Leg - 1 Holes - 1 Required
1.375 x 3.375 x 50.5 [3.49 x 8.57 x 128.27]
Inside
5/16 X 2"
LAG
SCREW
5/16 X 2"
HEX
HEAD
BOLT
5/16 X 1 1/2"
HEX
HEAD
BOLT
5/16"
INTERNAL
TOOTH
LOCK
WASHER
5/16" FLAT
WASHER
5/16"
SPIKE TEE
NUT
1/4"
BARREL
HEAD
NUT
1/4 X 3/4"
PHILLIPS
TRUSS
HEAD
BOLT
FLAT
WASHER
LOCK
WASHER
BARREL
NUT
BOLT
FLOOR
FLAT
WASHER
B6
H8
© Copyright Leisure Time Products Inc.
Sky Fort 09-0112
Y30-40G
2" x2" METAL
BRACKET
Note: pilot drill with 3/16” bit.
Y30-40G
Note: pilot drill with
3/16” bit.