Page 39
Step 59
Step 60
On
back
side above Bay Window. Start gable end with
P4, P7
then
P27, P28, P30
with holes at top flush with outside
of E8
Rafters and attach with 1 1/8” wood screws. Attach Q10’s to each side of window opening with 1” overhang at top and bottom
and attach to P7 and Q6 with 1 1/8” Wood Screws. Finish attaching Q10’s to P27, P28 and P30’s with 1 1/8” Wood Screws
P7
P4
P11
P13
P18
Q6
E8
E8
P7
P4
P27
P28
P30
Q6
Q10
P4 - Gable Board - 2 Holes - 2 Required
.625 x 3.375 x 60.75 [1.59 x 8.57 x 154.31]
P7 - Gable Board - 2 Holes - 2 Required
.625 x 3.375 x 53.75 [1.59 x 8.57 x 136.53]
P11 - Gable Board - 2 Holes - 1 Required
.625 x 3.375 x 46.75 [1.59 x 8.57 x 118.75]
P13 - Gable Board - 2 Holes - 1 Required
.625 x 3.375 x 39.75 [1.59 x 8.57 x 100.97]
P18 - Gable Board - 2 Holes - 1 Required
.625 x 3.375 x 32.75 [1.59 x 8.57 x 83.19]
P27 - Gable Window Board - 1 Hole - 2 Required
.625 x 3.375 x 20 [1.59 x 8.57 x 50.80]
P28 - Gable Window Board - 1 Holes - 2 Required
.625 x 3.375 x 16.5 [1.59 x 8.57 x 41.91]
P30 - Gable Window Board - 1 Hole - 2 Required
.625 x 3.375 x 13 [1.59 x 8.57 x 33.02]
Q6 - Gable Board - 2 Holes - 2 Required
.625 x 2.375 x 27.75 [1.59 x 6.03 x 70.49]
Q10 - Window Trim - 5 Holes - 2 Required
.625 x 2.375 x 12 [1.59 x 6.03 x 30.48]
#8 X 1-1/8"
WOOD
SCREW
Attach
Gable Boards
to inside of E8 Rafters on front of clubhouse starting with P4 then P7, P11, P13,
P18 and Q6 with 1 1/8” Wood Screws on front side.
(Note: Pilot drill holes on top).
© Copyright Leisure Time Products Inc.
Sky Fort 09-0112