Page 45
Step 75
Attach Rocks to
O1 Double Rock Wall Slat
and
O2 Single Rock Wall Slats
with 1” Phillips Truss Head bolt with through rock
and 5/16”Lock washer and Flat Washer on barrel nut ( Per diagram) . To assemble Rock Wall start at bottom of K4 Rock Wall
Rails with O3 Blank Rock Wall Slat with 3 ½” overhang on each side and attach using 1 ½” Wood Screws. At top of K4 Rails ¼”
down from angle point attach O3 Rock Wall Slat with 3 ½” overhang on each side with 1 ½” Wood Screws. Lay out remaining
Rock Wall Slats from bottom O3, O1, O2 then repeat (Per diagram) and attach with 1 ½” Wood Screws. Attach Q5 Rock Wall
Slat to top of Rock Wall Assembly with 1 ½” Wood Screws.
Mark Floor Rail H10 front right in center of K4 Rails then measure down to center and drill 3/8” hole. Attach to Floor Rail with
5/16” X 2 ½” Lag Screws, Lock Washers, and Flat Washers.
K4 - Rock Wall Rail - No Holes - 2 Required
.9375 x 3.375 x 63 [2.38 x 8.57 x 160.02]
O1 - Rock Wall Slat - 8 Holes - 4 Required
.625 x 4.375 x 29 [1.59 x 11.11 x 73.66]
O2 - Rock Wall Slat - 6 Holes - 4 Required
.625 x 4.375 x 29 [1.59 x 11.11 x 73.66]
O3 - Rock Wall Slat - 4 Holes - 6 Required
.625 x 4.375 x 29 [1.59 x 11.11 x 73.66]
Q5 - Rock Wall Slat - 2 Hole - 1 Required
.625 x 2.375 x 21.75 [1.59 x 6.03 x 55.25]
GREEN PLASTIC
ROCKS
12 REQUIRED
X20-G12
BOLT
5/16”
LOCK
WASHER
ROCK
BO
ARD
FLAT
WASHER
BARREL
NUT
Use 1/4” x 1” Phillips Truss Head Bolt with 5/16”
Lock Washer. Then place 5/16” Flat Washer on
Barrel Nut and attach Rock to each board.
B1
H10
Q5
#8 X 1-1/2"
WOOD
SCREW
5/16 X 2-1/2"
LAG
SCREW
5/16"
INTERNAL
TOOTH
LOCK
WASHER
5/16" FLAT
WASHER
O3
O3
3 1/2” overhang
O3
O2
O1
TOP
BOTTOM
© Copyright Leisure Time Products Inc.
Sky Fort 09-0112
Note: Pilot drill with 3/16” bit.