Page 50
Step 88
Step 89
Step 87
Drive 5/16” Spike T-Nuts into
E9 Crows
Nest Floor Rails,
note to inside (per diagram).
Attach
K15 Crows Nest
Floor Rail
to E9s with 2 ½”
Wood Screws (per diagram).
Note: Notch in K15 and
counter sink holes in E9s.
A t t a c h
Y 3 0 - 2 7 G M e t a l
Bracket
to inside of E9 Rails
with 5/16” X 1 ½” Hex Bolts,
Lock Washers, Flat Washers,
and secure to Spike T-Nuts
installed earlier.
Y27
Set Crow's Nest Floor Assembly
on top of Beam and attach to
K19 Rail using 5/16” X 2 1/2” Hex
Bolts, Lock Washers, Flat
Washers and Spike T-Nuts that
are inserted inside Clubhouse
(per diagram).
K19
B8
Attach
E14 Crow's Nest Deck Braces
to K15 Rail with 5/16” X 2” Hex Bolts, Lock Washers, Flat Washers,
and Spike T-Nuts inserted (per diagram).
Note: Just snug.
Level Crow's Nest Floor Rails and attach E14's to A1 Beam with 5/16” X 2 ½” Lag Screws, Lock Washers
and Flat Washers. Now finish tightening Hex Bolts.
A1
A1
E14
E9 - Crows Nest Floor Rail - 8 Hole - 2 Required
1.375 x 3.375 x 37.75 [3.49 x 8.57 x 95.89]
E14 - Crows Nest Deck Brace - 3 Holes - 2 Required
1.375 x 3.375 x 10.5 [3.49 x 8.57 x 26.67]
K15 - Crows Nest Floor Rail - 8 Holes - 1 Required
.9375 x 3.375 x 27 [2.38 x 8.57 x 68.58]
E9
E9
Y27
K15
E9
E9
5/16 X 1 1/2"
HEX
HEAD
BOLT
5/16 X 2-1/2"
LAG
SCREW
#8 X 2-1/2"
WOOD
SCREW
5/16"
INTERNAL
TOOTH
LOCK
WASHER
5/16"
SPIKE TEE
NUT
5/16" FLAT
WASHER
E14
A1
1”
2”
E9
© Copyright Leisure Time Products Inc.
Sky Fort 09-0112
Front
Back
E9
E9
E9
E9
K15
K15
Y30-27G
Metal Bracket
5/16 X 2 1/2"
HEX
HEAD
BOLT
Note: Pilot drill with 3/16” bit.
5/16 X 2"
HEX
HEAD
BOLT