Page 51
Step 90
Step 91
Step 92
Set
E13 Crow's Nest Floor
Support
on top of A1 Beam and
against E14 Deck Braces and
secure using Y30-27G Metal
Bracket with 5/16” X 1 ½” Lag
Screw, Lock Washers and Flat
Washers (per diagram).
Attach S
wing Hangers Z3
to E9 Rails
with 5/16” Lock Washers, Flat
Washers and 5/16” Lock Nuts in
counter sunk holes.
Attach nine
O4 Crow's
Nest Floor Boards
to Floor
Rails using 1 ½” Wood
Screws.
A1
E13
E9
Z3
F1
F1
F1
F1
E13 - Crows Nest Floor Support - No Holes - 1 Required
1.375 x 3.375 x 24.25 [3.49 x 8.57 x 61.60]
F1 - Crows Nest Wall Support - 2 Holes - 4 Required
1.375 x 2.375 x 37.5 [3.49 x 6.03 x 95.25]
O4 - Crows Nest Floor Board - 4 Holes - 9 Required
.625 x 4.375 x 27 [1.59 x 11.11 x 68.58]
A1
E13
Y30-27G
O4
Z3 QUICK LINK SWING HANGER
5/16 X 2 3/4"
HEX
HEAD
BOLT
5/16 X 1 1/2"
LAG
SCREW
5/16"
INTERNAL
TOOTH
LOCK
WASHER
5/16"
SPIKE TEE
NUT
5/16" FLAT
WASHER
© Copyright Leisure Time Products Inc.
Sky Fort 09-0112
Y30-27G
Metal Bracket
SWING SAFETY
WASHER
ZFW17x30
FENDER
WASHER
ZFW8x27
E13
Y30-27G
Attach four
F1 Crow's Nest Wall Supports
to
E9 Rails using 5/16” X 2 ½” Hex Bolts, Lock
Washers, Flat Washers into 5/16” Spike T-Nuts
inserted in earlier step.