7.2
Put the Central Unit in Operation
1.
In the main menu of the E-Link classic select 'Operation'.
2.
Make sure the display shows 'In opera' (In operation).
3.
Disconnect the E-Link classic.
4.
Close the doors of the central unit.
5.
Put the robot unit(s) in operation with the E-Link (page 7
7.3
Take the Central Unit Out of Operation
1.
Take the robot unit(s) connected to the central unit out of operation
with the E-Link (page 7
2.
Open the doors of the central unit.
3.
Connect the E-Link classic to the central unit.
4.
In the main menu of the E-Link classic select 'Operation'.
5.
Make sure the display shows 'Out ope' (Out operation).
7.4
Put the Robot Unit in Operation
7.4.1
Put the Robot Unit in Operation with the E-Link
1.
On the E-Link select:
• Button [
], to open the quick launch buttons bar
• Button
2.
During start up, button
is displayed.
3.
When the milking robot is in operation, button
(stop) is
displayed.
7.4.2
Put All Robots in a Cluster in Operation with the CRS+
A cluster is in operation when all robots in the cluster are put in operation on
the CRS+ AND when all robots are put in operation locally.
1.
In the display main status screen, push button [PROG].
2.
Select 'Cluster operation' > 'In oper.' > 'Yes'
The selected cluster is put in operation.
Basic Operating Instructions
7-9
5.1004.8506.0 -
Summary of Contents for ASTRONAUT A4
Page 2: ...INTENTIONALLY BLANK ii ...
Page 18: ...INTENTIONALLY BLANK 4 6 Safety Decals 5 1004 8506 0 ...
Page 20: ...INTENTIONALLY BLANK 5 2 Safety Decal Maintenance 5 1004 8506 0 ...
Page 22: ...INTENTIONALLY BLANK 6 2 Emergency Stop Buttons 5 1004 8506 0 ...
Page 38: ...INTENTIONALLY BLANK 7 16 Basic Operating Instructions 5 1004 8506 0 ...