LEMA Off-Grid User Manual (DM-003-A)
© 2021 LEMA - lema.io
Saint Paul, Minnesota, USA
Page |
68
(1x) Copper Braid (20ft/6m)
Figure 5-43 - Wire Routing along Mast and Goal Post
(Note: The wires will be coming out of the hole in the top of the mast)
Connect the (1x) Solar Tracker Controller Power & Data Cable (42ft/12.8m) to the Solar Track Controller as shown. Be
sure to include a small loop of excess cable as shown in the figure above.
Route the Copper Braid through the aluminum grounding lug shown in the above figure.
Add aluminum
grounding lug
to this tapped
hole
Summary of Contents for LOG-0001-A
Page 95: ...LEMA Off Grid User Manual DM 003 A 2021 LEMA lema io Saint Paul Minnesota USA Page 95...
Page 99: ...LEMA Off Grid User Manual DM 003 A 2021 LEMA lema io Saint Paul Minnesota USA Page 99...
Page 101: ...LEMA Off Grid User Manual DM 003 A 2021 LEMA lema io Saint Paul Minnesota USA Page 101...