Figure 5-63 - Insert the Bottom Plate
The order of battery install is:
BAT 101 – Bottom shelf back
BAT 102 – Bottom shelf front
BAT 103 – Top shelf back
BAT 104 – Top shelf front
The black terminal of battery BAT 101 is the DC round of the system.
The following picture illustrates placing battery 101.
Figure 5-64 - Install Battery BAT 101
Before physically pushing the battery all the way to the back as shown in the above image, you need to set the battery
on the ground in front of the electrical enclosure and connect the appropriate cables and rubber battery terminal
covers.
The battery cables are long enough so that you can always connect the battery with the bolt, lock washer and nut, on
the ground with the appropriate tools, before you lift the battery and put it into position.
Summary of Contents for LOG-0001-A
Page 95: ...LEMA Off Grid User Manual DM 003 A 2021 LEMA lema io Saint Paul Minnesota USA Page 95...
Page 99: ...LEMA Off Grid User Manual DM 003 A 2021 LEMA lema io Saint Paul Minnesota USA Page 99...
Page 101: ...LEMA Off Grid User Manual DM 003 A 2021 LEMA lema io Saint Paul Minnesota USA Page 101...