Installation manual
– English
Storm braces
(NB! Not included in some house option kits!)
Attach the storm braces (if included in
the supplied kit) to the inner sides of
the front (2 units) and back (2 units)
walls with the supplied bolts. It is
important for the logs to be drilled
through in advance. Please keep the
distances indicated in the drawing so
that no problems occur due to wood
swelling or diminishing.
ADVICE
: Make sure that the storm
braces are attached to the apex log
from above and to the middle of the
first full-length wall log from below. If
necessary, shorten the upper ends of
the slats.
Do not turn the screws tightly so wood
can further swell or diminish.
With the house having settled, you
should adjust the attachments so the
wall logs can settle.
Installation of storm braces:
General advice:
Problem:
Gaps appear between the wall logs
Cause:
Additional details are attached to the house that do not allow wood to
swell/diminish.
Solutions:
If the door/window is attached to the wall logs with screws/nails, remove these
screws/nails;
If the storm brace is screwed on too tightly, loosen its attachment;
If (rain water) pipes are installed on the wall, loosen their attachments;
Problem:
The doors and windows become stuck.
Cause:
The house/foundation has settled.
Solution:
Check whether the house is level. Level the foundation joists and walls.
Cause:
The doors and windows have swelled due to moisture.
Solution:
Adjust the door and window hinges; if necessary, plane the door or window narrower.
We wish you total success with the garden house installation and
much joy with this house for many years to come!
Summary of Contents for 109163
Page 5: ......
Page 6: ......
Page 7: ...BOX ...
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ...Ø3 1 SP2 5x80 RoR1 Ø3 1 A A B 6x180 RoR1 5x90 5x90 5x80 RoR2 SP2 6x150 B SP1 SP2 SP2 SP2 2180 ...
Page 16: ...RE2 x RB2 x SP2 4 5x50 RE2 2 RE2 3 RE2 1 C C ca 25 ca 1 RB2 2 RB2 1 ...
Page 18: ...RE2 x RB2 x SP2 Rai7 Rai8 Rai7 Rai8 Rai7 Rai8 4 5x50 E E ...
Page 19: ...19x114 19x114 RE2 x RB2 x SP2 underlayer is recommended SBS SBS SBS ca 200 SBS ...
Page 20: ...SBS SBS SBS CoB CoB 4 5x50 SBS underlayer is recommende ...
Page 21: ...GLUE 19x114 19x114 RE2 x RB2 x SP1 EPDM EPDM ...