507281-06
Page 51 of 58
Issue 1724
Model
Natural to LP/
Propane
High Altitude
Natural Burner
Orifice Kit
High Altitude LP/
Propane Burner
Orifice Kit
High Altitude Pressure Switch
0 - 7500 ft
(0 - 2286m)
7501 - 10000 ft
(2286 - 3048m)
7501 - 10000 ft
(2286 - 3048m)
4501 - 7500 ft
(1371 - 2286m)
7501 - 10000 ft
(2286 - 3048m)
045
11K48
*51W01
11K47
14A47
14A50
070
14A54
14A53
090
14A57
14A54
110
14A46
14A51
135
14A49
14A51
*Conversion requires installation of a gas valve manifold spring which is provided with the gas conversion kit.
Pressure switch is factory set. No adjustment necessary. All models use the factory-installed pressure switch from 0-4500 feet (0-
1371 m).
Table 15. Conversion Kit Fan Pressure Switch Requirements at Varying Altitudes
7. Is the manual main shut–off valve open?
8. Is the internal manual shut–off valve open?
9. Is the unit ignition system in lockout? If the unit locks
out again, inspect the unit for blockages.
Heating Sequence of Operation
1. When thermostat calls for heat, combustion air inducer
starts.
2. Combustion air pressure switch proves blower
operation. Switch is factory set and requires no
adjustment.
3. After a 15 second pre-purge, the hot surface ignitor
energizes.
4. After a 20 second ignitor warm-up period, the gas
valve solenoid opens.
5. Gas is ignited, flame sensor proves the flame, and the
combustion process continues.
6. If flame is not detected after first ignition trial, the
ignition control will repeat steps 3 and 4 four more
times before locking out the gas valve. The ignition
control will then automatically repeat steps 1 through
6 after 60 minutes. To interrupt the 60 minute period,
move thermostat from “Heat” to “OFF” then back to
“Heat”. Heating sequence then restarts at step 1.
Gas Pressure Adjustment
Gas Flow (Approximate)
Table 14.
Gas Meter Clocking Chart
Model
Seconds for One Revolution
Natural
LP
1 cu ft
Dial
2 cu ft
Dial
1 cu ft
Dial
2 cu ft
Dial
-045
80
160
200
400
-070
55
110
136
272
-090
41
82
102
204
-110
33
66
82
164
-135
27
54
68
136
Natural - 1000 btu/cu ft
LP - 2500 btu/cu ft
Furnace should operate at least 5 minutes before checking
gas flow. Determine time in seconds for two revolutions of
gas through the meter. (Two revolutions assures a more
accurate time.) Divide by two and compare to time in Table
14. If manifold pressure matches Table 16 and rate is
incorrect, check gas orifices for proper size and restriction.
Remove temporary gas meter if installed.
NOTE
:
To obtain accurate reading, shut off all other gas
appliances connected to meter.
Supply Pressure Measurement
An inlet pressure post on the inlet side of the gas valve
provides access to the supply pressure. See Figure 67.
Back out the 3/32 Hex screw one turn, connect a piece
of 5/16” tubing and connect to a manometer to measure
supply pressure.
NOTE
:
Shut unit off and remove manometer as soon as
an accurate reading has been obtained. Take care to re-
tighten the 3/32 Hex screw.