FORKLIFT PROTECTIONS
REMOVE THE FORKLIFT PROTECTIONS BEFORE INSTALLATION
PRELIMINARY CHECKS
Before installing the equipment, the following points MUST
be checked:
- Have the forklift protections been removed?
- Is there sufficient space for the equipment?
- Is the surface on which the equipment is to be
installed sufficiently solid to withstand its weight? A
detailed study of the frame must be made beforehand.
- Do the supply and return ductwork openings
excessively weaken the structure?
- Are there any obstructing items which could hinder the
operation of the equipment?
- Does the electrical power available correspond to the
equipment's electrical specifications?
- Is drainage provided for the condensate?
- Is there sufficient access for maintenance?
- Installation of the equipment could require different
lifting methods which may vary with each installation
(helicopter or crane). Have these been evaluated?
- Ensure that the unit is installed in accordance with the
installation instructions and local applicable codes.
- Check to ensure that the refrigerant lines do not rub
against the cabinet or against other refrigerant lines.
In general, make sure no obstacles (walls, trees or roof
ledges) are obstructing the duct connections or hindering
assembly and maintenance access.
INSTALLATION REQUIREMENTS
The surface on which the equipment is to be installed must
be clean and free of any obstacles which could hinder the
flow of air to the condensers:
-Avoid uneven surfaces
-Avoid installing two units side by side or close to each
other as this may restrict the airflow to the condensers.
Before installing a packaged Rooftop unit it is important to
understand:
- The direction of prevailing winds
-The direction and position of air flows.
-The external dimensions of the unit and the
dimensions
of the supply and return air connections.
-The arrangement of the doors and the space required
to open them to access the various components.
CONNECTIONS
-Ensure that all the pipe-work crossing walls or roofs
are secured, sealed and insulated.
-To avoid condensation problems, make sure that all
pipes are insulated according to the temperatures of
fluids and type of rooms.
NOTE: The AQUILUX protection sheets fitted to the finned
surfaces must be removed prior to start up.
Fig. 15
Summary of Contents for BAC020SNM
Page 11: ...COMMISSIONING REPORT BALTIC R410A IOM 0708 E Page 10 ...
Page 66: ...VENTILATION AIRFLOW BALANCING BALTIC R410A IOM 0708 E Page 65 ROOF TOP AT15 11S ...
Page 67: ...VENTILATION AIRFLOW BALANCING BALTIC R410A IOM 0708 E Page 66 ROOF TOP AT15 15S ...
Page 69: ...VENTILATION AIRFLOW BALANCING BALTIC R410A IOM 0708 E Page 68 AT10 10S EXHAUST ROOF CURB ...
Page 70: ...VENTILATION AIRFLOW BALANCING BALTIC R410A IOM 0708 E Page 69 EXHAUST ROOF CURB AT10 8G2L ...
Page 71: ...VENTILATION AIRFLOW BALANCING BALTIC R410A IOM 0708 E Page 70 EXHAUST ROOF CURB AT10 10G2L ...
Page 126: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 125 ...
Page 127: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 126 ...
Page 128: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 127 ...
Page 129: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 128 ...
Page 130: ...CERTIFICATES G4 FILTERS BALTIC R410A IOM 0708 E Page 129 ...
Page 131: ...CERTIFICATES F7 FILTERS BALTIC R410A IOM 0708 E Page 130 ...
Page 132: ...CERTIFICATES CLIMAVER 202 BALTIC R410A IOM 0708 E Page 131 ...
Page 133: ...CERTIFICATES CLIMAVER 274 BALTIC R410A IOM 0708 E Page 132 ...
Page 134: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 133 ...
Page 135: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 134 ...
Page 136: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 135 ...