ARRANGEMENT DRAWINGS
BALTIC R410A-IOM-0708-E
Page 35
WITH OPTIONS
(Return and supply opening shown on this drawing do not apply to
BAC/BAH with electric heater or hot water coil )
BAC
BAH
065 075
1D
Down supply air
3
Fresh air
5D
Down hot water entry
8
Extraction
1F
Front supply air
4F
Front main power entry
9
Smoke outlet
2D
Down return air
4D
Down main power
entry
71
Outdoor coil inlet
10
Condensate drainage
2F
Front return air
5F
Front hot water entry
70
Outdoor coil outlet
(*) Total Length (unit + option)
Summary of Contents for BAC020SNM
Page 11: ...COMMISSIONING REPORT BALTIC R410A IOM 0708 E Page 10 ...
Page 66: ...VENTILATION AIRFLOW BALANCING BALTIC R410A IOM 0708 E Page 65 ROOF TOP AT15 11S ...
Page 67: ...VENTILATION AIRFLOW BALANCING BALTIC R410A IOM 0708 E Page 66 ROOF TOP AT15 15S ...
Page 69: ...VENTILATION AIRFLOW BALANCING BALTIC R410A IOM 0708 E Page 68 AT10 10S EXHAUST ROOF CURB ...
Page 70: ...VENTILATION AIRFLOW BALANCING BALTIC R410A IOM 0708 E Page 69 EXHAUST ROOF CURB AT10 8G2L ...
Page 71: ...VENTILATION AIRFLOW BALANCING BALTIC R410A IOM 0708 E Page 70 EXHAUST ROOF CURB AT10 10G2L ...
Page 126: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 125 ...
Page 127: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 126 ...
Page 128: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 127 ...
Page 129: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 128 ...
Page 130: ...CERTIFICATES G4 FILTERS BALTIC R410A IOM 0708 E Page 129 ...
Page 131: ...CERTIFICATES F7 FILTERS BALTIC R410A IOM 0708 E Page 130 ...
Page 132: ...CERTIFICATES CLIMAVER 202 BALTIC R410A IOM 0708 E Page 131 ...
Page 133: ...CERTIFICATES CLIMAVER 274 BALTIC R410A IOM 0708 E Page 132 ...
Page 134: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 133 ...
Page 135: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 134 ...
Page 136: ...CERTIFICATES BALTIC R410A IOM 0708 E Page 135 ...