eNeRGy-IOM-2020.12-EN
•
20
•
Condensate drains
The condensate drains are not assembled when delivered and are stored in the electrical panel with their clamping collars. To assemble
them, insert them on the condensate tray outlets and use a screwdriver to tighten the collars. The drains must be installed in vertical
position.
For the thermodynamic heat recovery circuit it’s not necessary to add a separated condensate drain on the outdoor coil.
Preliminary checks
Before installing the equipment, the following points MUST be checked:
• Is there sufficient space for the equipment?
• Is the surface on which the equipment is to be installed sufficiently solid to withstand its weight? A detailed study of the frame must be
made beforehand. The surface on which the equipment is to be installed must be flat. (See next paragraph)
• Do the supply and return ductwork openings excessively weaken the structure?
• Are there any obstructing items which could hinder the operation of the equipment?
• Does the electrical power available correspond to the equipment's electrical specifications?
• Is drainage provided for the condensate?
• Is there sufficient access for maintenance?
• Installation of the equipment could require different lifting methods which may vary with each installation (helicopter or crane). Have
these been evaluated?
• Ensure that the unit is installed in accordance with the installation instructions and local applicable codes.
• Check to ensure that the refrigerant lines do not rub against the cabinet or against other refrigerant lines.
In general, make sure no obstacles (walls, trees or roof ledges) are obstructing the duct connections or hindering assembly and
maintenance access.
Installation requirements
The surface on which the equipment is to be installed must be clean and free of any obstacles which could hinder the flow of
air to the condensers:
• Uneven surfaces are prohibited. The surface must be flat and respect a maximal flatness of 0.5mm per linear meter (in both
directions length and width). See below an example with 6000 mm long unit:
D
DELIVERY CHECKS
Summary of Contents for E014AH055FM2M
Page 2: ......
Page 5: ...eNeRGy IOM 2020 11 EN 5...