Page 21
VIII-WIRING DIAGRAMS AND SEQUENCE OF OPERATIONS
O24/ OF24 OPERATION SEQUENCE
:
1 - When there is a call for heat, W1 of the thermostat
energizes W of the A3 board with 24VAC.
2 - N.O. 1K2 contacts close energizing combustion air
blower / pump B6.
3 - When 1K2 closes the electronic ignitor is energized.
When 1K1 closes the solid state switch and cad cell
are energized. When the cad cell senses light the
soild state switch de-energizes the safety heater,
keeping the burner operating.
4 - After a short period, the unit provides sufficient heat
to close fan contacts S57. This energizes the blower
B3.