Page 42
FIGURE 55
ML195UH with Evaporator
Coil Using a Common Drain
(1” min. to 2” Max.above
condensate drain connection)
Condensate
Drain Connection
Evaporator drain
line required
IMPORTANT
When combining the furnace and evaporator
coil drains together, the A/C condensate drain
outlet must be vented to relieve pressure in or
der for the furnace pressure switch to operate
properly.
FIGURE 56
ML195UH with Evaporator Coil Using a Common Drain
(Unit shown in horizontal left−hand discharge position)
Condensate Drain
Connection
(4” min. to 5” Max.above
condensate drain connection)
5’ max.
PVC Pipe Only
4”min
5”max
Evaporator
Coil
Drain Pan
Piping from furnace and evaporator coil must
slope down a minimum 1/4” per ft. toward trap