Page 50
G60UHV(X) Start−Up & Performance Check List
w.c. − LP/Propane
Filter Clean & Secure?
Line Voltage
Electrical Connections Tight?
Job Name
Job Location
Installer
Unit Model No.
Furnace Btu Input (High fire)
Line Pressure
Job No.
City
City
Serial No.
Date
State
Technician
Flue Connections Tight?
Heating Section
Thermostat
Heat Anticipator Setting?
Thermostat Level?
Fuel Type: Natural Gas?
Blower Motor Amps
Blower Motor H.P.
Gas Piping Connections
Tight & Leak−Tested?
Proper Draft?
State
Blower OFF Delay Setting (60, 90, 120 or 180)?
Blower ON delay confirmed?
(45 Seconds Fixed On)
High Fire Manifold Pressure
w.c. − Nat.:
LP/Propane Gas?
Combustion Gas Tested (high fire and low fire)?
CO
2
CO
w.c. − LP/Propane
Low Fire Manifold Pressure
w.c. − Nat.:
Temperature Rise
External Static Pressure?
(0.8 maximum)