Page 60
(Unit shown in upflow position with remote trap)
*5’ max.
To Drain
PVCPipeOnly
FieldProvidedVent
Min. 1” AboveCondensate
DrainConnection
1” Min.
Trap Can Be Installed a
Maximum 5’ From Furnace
2” Max.
CONDENSATE TRAP LOCATIONS
*Piping from furnace must slope down a
minimum 1/4” per ft. toward trap
FIGURE 41
HorizontalFurnace4” Min. to 5” Max.above
condensatedrain connection)
FurnaceCondensate
DrainConnection
From Evaporator Coil
Optional
Condensate Trap With Optional Overflow Switch
FIGURE 42
Furnace With Evaporator
Coil Using A Separate Drain
Condensate
DrainConnection
Field Provided Vent
(1” min. 2” max. above
condensate connection)
Evaporator drain
line required
(Trap at coil is optional)
FIGURE 43