Chapter 3. Installation
Inspecting the equipment
About this task
If any equipment has been damaged during shipment, keep the shipping cartons
and packing materials and contact your place of purchase.
Note:
Check the battery recharge date on the shipping carton label. If the date has
passed and the battery packs were never recharged, do not use the UPS. Contact
your service representative.
Unpacking the unit
About this task
Important:
Unpacking the unit in a low-temperature environment might cause
condensation to occur in and on the unit. Do not install the unit until the inside
and outside of the unit are absolutely dry (hazard of electric shock).
Procedure
1.
Unpack the equipment and remove all packing materials and the shipping
carton.
Note:
Do not lift the UPS or EBM from the front panel.
Figure 4. Unpacking the UPS and Extended Battery Module
2.
Discard or recycle the packaging in a responsible manner, or store it for future
use.
© Copyright Lenovo 2015
17
Summary of Contents for 5594-5KX
Page 1: ...3U Rack or Tower UPS RT5 0kVA and RT6 0kVA Installation and User s Guide ...
Page 2: ......
Page 3: ...3U Rack or Tower UPS RT5 0kVA and RT6 0kVA Installation and User s Guide ...
Page 6: ...iv Installation and User s Guide ...
Page 18: ...xvi Installation and User s Guide ...
Page 22: ...4 Installation and User s Guide ...
Page 34: ...16 Installation and User s Guide ...
Page 50: ...32 Installation and User s Guide ...
Page 60: ...42 Installation and User s Guide ...
Page 72: ...54 Installation and User s Guide ...
Page 84: ...66 Installation and User s Guide ...
Page 86: ...68 Installation and User s Guide ...
Page 87: ......
Page 88: ...Part Number 00WA360 Printed in USA 1P P N 00WA360 ...