5.
Mount the UPS on rack.
6.
Put back the battery packs, screw back the metal protection cover and the front
panel, then clip the center cover.
Rack mounting of the UPS and EBM
About this task
The UPS and connected EBMs must be installed no higher than 5 feet (1.5m) above
the floor to allow for easy installation and servicing.
Procedure
Follow steps 1 to 4 in the illustration for module mounting on the rails.
The rails and necessary hardware are supplied by Lenovo.
Tower installation
About this task
To install the unit in a tower configuration:
Procedure
1.
Place the UPS on a flat, stable surface, in its final location.
2.
Always keep 150 mm of free space behind the UPS rear panel.
3.
If installing additional units, place them next to the UPS in their final location.
22
Installation and User's Guide
Summary of Contents for 5594-5KX
Page 1: ...3U Rack or Tower UPS RT5 0kVA and RT6 0kVA Installation and User s Guide ...
Page 2: ......
Page 3: ...3U Rack or Tower UPS RT5 0kVA and RT6 0kVA Installation and User s Guide ...
Page 6: ...iv Installation and User s Guide ...
Page 18: ...xvi Installation and User s Guide ...
Page 22: ...4 Installation and User s Guide ...
Page 34: ...16 Installation and User s Guide ...
Page 50: ...32 Installation and User s Guide ...
Page 60: ...42 Installation and User s Guide ...
Page 72: ...54 Installation and User s Guide ...
Page 84: ...66 Installation and User s Guide ...
Page 86: ...68 Installation and User s Guide ...
Page 87: ......
Page 88: ...Part Number 00WA360 Printed in USA 1P P N 00WA360 ...