Lenovo Y400/Y500 Hardware Maintenance Manual
54
Figure 10. Removal steps of system board
When installing:
Make sure that all the connectors are attached firmly.
Remove the system board in the direction shown by arrow
.
When installing:
When attaching the system board to the base cover, adjust the
placement of the ports as shown in
. Improper placement of the ports or those
jacks might cause a damage.
Step
Screw (quantity)
Color Torque
M2.5 × 4 mm, flat-head, nylok-coated (3)
Black
1.5 ~2.0 kgfcm
a
b
a
c
Y500
c
a
a
Summary of Contents for IdeaPad Y400
Page 1: ...Lenovo Y400 Y500 Hardware Maintenance Manual ...
Page 103: ...Notices 99 ...