Figure 64. Dual—interconnect configuration — storage block and network interconnect connections
Peer-link connection (dual-interconnect configuration)
Set up the peer link between the interconnects using the QSFP+ Direct Attach Cables (DACs) that are
provided with the configuration.
1. Connect port 49 on the primary interconnect to port 49 on the secondary interconnect.
2. Connect port 50 on the primary interconnect to port 50 on the secondary interconnect.
Figure 65. Dual-interconnect configuration — inter-interconnect link network connectivity
.
Part replacement and maintenance procedures
141
Summary of Contents for ThinkAgile CP
Page 4: ...ii Lenovo ThinkAgile CP Hardware Part Replacement and Component Maintenance Procedures ...
Page 6: ...iv Lenovo ThinkAgile CP Hardware Part Replacement and Component Maintenance Procedures ...
Page 8: ...vi Lenovo ThinkAgile CP Hardware Part Replacement and Component Maintenance Procedures ...
Page 30: ...22 Lenovo ThinkAgile CP Hardware Part Replacement and Component Maintenance Procedures ...
Page 33: ...Chapter 4 Managing Support Mode 25 ...
Page 80: ...72 Lenovo ThinkAgile CP Hardware Part Replacement and Component Maintenance Procedures ...
Page 158: ...150 Lenovo ThinkAgile CP Hardware Part Replacement and Component Maintenance Procedures ...
Page 160: ...152 Lenovo ThinkAgile CP Hardware Part Replacement and Component Maintenance Procedures ...
Page 161: ......
Page 162: ......