Installing the Air-Duct Option
The NE1064TO supports an optional 1U air duct to maximize air flow conditions in
a 19” rack.
The air-duct option is only supported when the switch is installed on a 4-post rack
mount kit basis. If the switch is installed on a rack using default 2-post rack mount
kit, it will not support the air-duct option.
For information on removing an installed 1U air-duct option, see
The following table lists the parts included with the air-duct option kit.
Attention:
The rack-mounting frame may not be able to support the weight of the
networking switch with only the front post mounting brackets (2-post application).
If the switch has an undesirable amount of sag, it is recommended to use a 4-post
mounting kit.
Attention:
For earthquake stability, mount the switch in a 4-post rack.
Table 12.
Air-duct Option Kit parts
Item Number
Description
Quantity
1
Cable tie
4
2
1U Duct sleeve (long)
1
3
Mounting bracket (left)
1
4
Mounting bracket (right)
1
5
Foam carrier assembly
2
6
M3.5 screws
6
1
6
5
Summary of Contents for ThinkSystem NE1064TO RackSwitch
Page 1: ...Lenovo ThinkSystem NE1064TO RackSwitch Installation Guide For Network Operating System ...
Page 6: ...6 Lenovo NE1064TO Installation Guide ...
Page 14: ...14 NE1064TO Installation Guide ...
Page 54: ...54 NE1064TO Installation Guide ...
Page 70: ...70 NE1064TO Installation Guide ...