![background image](http://html.mh-extra.com/html/lenovo/thinksystem-sr950-7x11/thinksystem-sr950-7x11_setup-manual_203240132.webp)
Step 1. Disconnect all cables on the compute system board that go to connectors in the compute tray. See
“Internal cable routing” on page 24.
Step 2. Press the release clips and slide the compute system board out of the compute tray.
After you remove the compute system board:
• If you removed the upper compute system board and are not installing another compute system board ,
install a compute system board filler, install the compute tray, and install the front cover. See “Install a
compute system board filler” on page 130, “Install the compute tray (fully removed)” on page 125, and
“Install the front cover” on page 139.
• If you removed the lower compute system board, it must be replaced before you reinstall the upper
compute system board or filler.
If you are instructed to return the compute system board, follow all packaging instructions, and use any
packaging materials for shipping that are supplied to you.
Install a compute system board
Install a compute system board by inserting it in the compute tray, pushing it in until it locks in place, and
connecting the cables.
S002
CAUTION:
The power control button on the device and the power switch on the power supply do not turn off the
electrical current that is supplied to the device. The device also might have more than one power
cord. To remove all electrical current from the device, ensure that all power cords are disconnected
from the power source.
CAUTION:
Make sure that all server power cords are disconnected from their power sources before performing
this procedure.
If you are installing the lower compute system board in a tray, press the release clips and remove the upper
compute system board, or filler from the compute tray to access connectors on the lower compute system
board. See “Remove a compute system board” on page 126 or “Remove a compute system board filler” on
page 129.
Complete the following steps to install the compute system board:
Watch the procedure
. A video of the replacement process is available:
• Youtube:
https://www.youtube.com/playlist?list=PLYV5R7hVcs-DbSYJFY74PoKmph7vgrkKH&playnext=1
• Youku:
http://list.youku.com/albumlist/show/id_50952215
128
ThinkSystem SR950 Setup Guide
Summary of Contents for ThinkSystem SR950 7X11
Page 1: ...ThinkSystem SR950 Setup Guide Machine Types 7X12 7X11 and 7X13 ...
Page 4: ...ii ThinkSystem SR950 Setup Guide ...
Page 18: ...14 ThinkSystem SR950 Setup Guide ...
Page 44: ...Figure 22 Server components 40 ThinkSystem SR950 Setup Guide ...
Page 48: ...44 ThinkSystem SR950 Setup Guide ...
Page 98: ...94 ThinkSystem SR950 Setup Guide ...
Page 106: ...102 ThinkSystem SR950 Setup Guide ...
Page 166: ...162 ThinkSystem SR950 Setup Guide ...
Page 199: ...X XCC management front USB configuration 87 Copyright Lenovo 2017 195 ...
Page 200: ...196 ThinkSystem SR950 Setup Guide ...
Page 201: ......
Page 202: ......