b. Slide the upper tray filler out from the front of the server.
c. Some cables may be packaged separately with the option, make sure all the cables are
connected correctly to the lower system board and upper system board in the compute tray.
http://thinksystem.lenovofiles.com/help/topic/7X12/cable_routing_common.html
thinksystem.lenovofiles.com/help/topic/7X12/cable_routing_for_drives.html
.
d. Align the compute tray with the opening in the front of the chassis, and insert it.
e. Fully open the compute tray release levers, and push the compute tray into the chassis until it
stops.
f. Rotate the compute tray release levers towards the center until they lock and are fully closed.
g. Remove the fan fillers in fan bay 7 to 12, and install fans in those bays.
http://thinksystem.lenovofiles.com/help/topic/7X12/install_the_fan.html
Step 9. If a storage tray is installed in the upper-tray position, you must convert it to a compute tray to take
advantage of eight processors.
251
Summary of Contents for ThinkSystem SR950
Page 1: ...ThinkSystem SR950 Setup Guide Machine Types 7X12 7X11 and 7X13 ...
Page 55: ...Figure 22 Server components Chapter 2 Server components 51 ...
Page 276: ...272 ThinkSystem SR950 Setup Guide ...
Page 282: ...278 ThinkSystem SR950 Setup Guide ...
Page 286: ...282 ThinkSystem SR950 Setup Guide ...
Page 389: ......
Page 390: ......