Make sure that all server power cords are disconnected from their power sources before performing
this procedure.
Before you install the compute tray:
1. Make sure that all cables, adapters, and other components are installed and seated correctly and that
you have not left loose tools or parts inside the server.
2. Make sure that all internal cables are correctly routed. See “Internal cable routing” on page 35.
Complete the following steps to install the compute tray when it is fully removed from the chassis:
Watch the procedure
. A video of the replacement process is available:
•
•
Figure 78. Compute tray installation (fully removed)
Important:
Compute trays must be inserted in the chassis with the processors and memory visible from the
top.
Step 1. Align the compute tray with its opening in the front of the chassis and insert.
Step 2. Fully open the compute tray release levers and push the compute tray into the chassis until it stops.
Step 3. Rotate the compute tray release levers until they lock, fully closed.
If you are done performing installation or maintenance procedures at the front of the chassis, install the front
cover. See “Install the front cover” on page 322.
System board replacement
System boards are in the upper or lower compute tray that is accessed from the front of the server.
Important:
Before you return the system board, make sure that you install the CPU socket covers from the
new system board. To replace a CPU socket cover:
308
ThinkSystem SR950 Setup Guide
Summary of Contents for ThinkSystem SR950
Page 1: ...ThinkSystem SR950 Setup Guide Machine Types 7X12 7X11 and 7X13 ...
Page 55: ...Figure 22 Server components Chapter 2 Server components 51 ...
Page 276: ...272 ThinkSystem SR950 Setup Guide ...
Page 282: ...278 ThinkSystem SR950 Setup Guide ...
Page 286: ...282 ThinkSystem SR950 Setup Guide ...
Page 389: ......
Page 390: ......