Before you install the I/O tray:
1. Make sure that all cables, adapters, and other components in the I/O tray are installed and seated
correctly and that you have not left loose tools or parts inside the server.
2. Make sure that all internal cables are correctly routed. See “Internal cable routing” on page 35.
Complete the following steps to install the I/O tray:
Watch the procedure
. A video of the replacement process is available:
•
•
Figure 98. I/O tray installation
Attention:
When inserting the I/O tray, do not hit any of the I/O tray connectors against the edge of the
chassis.
Step 1. Align the I/O tray with its opening in the rear of the chassis and insert. Position the tray toward the
right side of the opening during insertion.
Step 2. Fully open the I/O tray release levers and push the tray into the chassis until it stops.
Step 3. Rotate the I/O tray release levers until they lock, fully closed.
After installing the I/O tray
• If you are done performing installation or maintenance procedures at the rear of the chassis, reconnect the
cables. See “Cable the server” on page 253.
• Update the machine type and serial number with new vital product data (VPD). Use the Lenovo XClarity
Provisioning Manager to update the machine type and serial number. See “Update the machine type and
serial number” on page 337.
• Enable TPM/TCM. See “Enable TPM/TCM” on page 338
• Optionally, enable Secure Boot. See “Enable UEFI Secure Boot” on page 341.
336
ThinkSystem SR950 Setup Guide
Summary of Contents for ThinkSystem SR950
Page 1: ...ThinkSystem SR950 Setup Guide Machine Types 7X12 7X11 and 7X13 ...
Page 55: ...Figure 22 Server components Chapter 2 Server components 51 ...
Page 276: ...272 ThinkSystem SR950 Setup Guide ...
Page 282: ...278 ThinkSystem SR950 Setup Guide ...
Page 286: ...282 ThinkSystem SR950 Setup Guide ...
Page 389: ......
Page 390: ......