Figure 124. Storage tray installation (fully removed)
Step 1. Align the storage tray with its opening in the upper bay at the front of the chassis and insert.
Step 2. Fully open the storage tray release levers and push the tray into the chassis until it stops.
Step 3. Rotate the storage tray release levers until they lock, fully closed.
If you are done performing installation or maintenance procedures at the front of the chassis, install the front
cover. See “Install the front cover” on page 322.
378
ThinkSystem SR950 Setup Guide
Summary of Contents for ThinkSystem SR950
Page 1: ...ThinkSystem SR950 Setup Guide Machine Types 7X12 7X11 and 7X13 ...
Page 55: ...Figure 22 Server components Chapter 2 Server components 51 ...
Page 276: ...272 ThinkSystem SR950 Setup Guide ...
Page 282: ...278 ThinkSystem SR950 Setup Guide ...
Page 286: ...282 ThinkSystem SR950 Setup Guide ...
Page 389: ......
Page 390: ......