½” Brass
Check Valve
Electrical Control Box
(Located left bottom
inside of base)
FULL TIME
PA
R
T
T
IM
E
PA
R
T
T
IM
E
2 Min.Timer
(D.pump)
L
ig
h
t
T
ra
n
sf
o
rm
e
r
Pipeless Motor
Power Plug
Power Plug
to wall outlet
3/8” clear Tube
from On/Off Switch
for Part time control box
3/8” Clear Tube from on/off for D/P pump
insert into 2 Min. Timer.
Make sure to push in tightly.
PLUMBER MUST BE UTILIZED TO INSTALL
CHECK VALVE
DRAIN OUTLET MUST BE ½”
FOR EFFICIENT DRAINAGE.
(SMALL Rubber Coupling)
Elbow
(LARGE Rubber Coupling)
LARGE Rubber Coupling
3/4” PVC Pipe
HANNING DPO 40 - 020
3/4” Elbow
Rubber Gasket
3/4 PVC Pipe
3/4” PVC Pipe
3/4 SLIP X ½” Male Adaptor
TEE 3/4 X 3/4 X ½
Poly Insert 90 Elb ½”
Clear Tubing 3/4 OD ½”ID
Air Check Valve
L E N O X
SE
Discharge Pump ( Optional):
Up to 4ft @ +/- 39 sec. with 1/2” Connection to main drain
Summary of Contents for MS
Page 1: ...OWNER S MANUAL L E N O X Please read user s Manual thoroughly before using pedicure spa MS ...
Page 5: ...Lenox Lenox J 41 5 ...
Page 10: ...Wall Drain Drain AConnection Discharge Pump ...
Page 11: ...15 tilt ...
Page 17: ...Top View Perspective View Bottom View Side View Rear View Metal Mesh tray off the floor ...
Page 23: ......
Page 25: ......