Electrical installation
Devices in the power range 0.37 ... 22 kW (3/PE AC 400 V)
Terminal assignment of the power connections
l
113
EDS84ASC552 EN 6.0
Strip cables
X105
X106
;
;;
;
84MOTL001_a
84MOTL001_b
U, V, W
PE
T1, T2
b
c
e
a
d
f
g
h
[mm]
[mm]
[mm]
E84AVxxx3714
E84AVxxx5514
E84AVxxx7514
E84AVxxx1124
E84AVxxx1524
E84AVxxx2224
30
65
7
90
9
95
30
10
E84AVxxx3024
E84AVxxx4024
E84AVxxx5524
25
70
12 ... 14
125
12 ... 14
105
25
10
E84AVxxx7524
E84AVxxx1134
E84AVxxx1534
25
80
14
120
14
115
25
10
E84AVxxx1834
E84AVxxx2234
30
110
16
195
16
160
30
10
How to proceed:
1. Strip motor cable and cable for motor temperature monitoring according to
specified dimensions.
2. Fold back the shield of the motor cable and motor temperature cable over the cable
sheath. Keep unshielded ends short.
3. Fix shield on the cable sheath (e.g. using a heat−shrinkable tube).
4. Fasten wire end ferrule to PE cable.
– The other cables may be wired without using wire end ferrules.
5. Connect the shields separately to the shield sheet using (metal) cable ties or shield
clamps.
– left: motor cable
– right: cable of motor temperature monitoring
– For strain relief of the cables, measures are required.
efesotomasyon.com - Lenze