Wiring the Fault Alarm Contact 

The fault alarm contact is in the middle of the terminal block connector as the picture shows 

below  in  Figure  2.11.  By  inserting  the  wires,  it  will  detect  the  fault  status  including  power 

failure or port link failure (managed industrial switch only) and form a normally open circuit. 

An application example for the fault alarm contact is shown below in Figure 2.11

 

Figure 2.11: Wiring the Fault Alarm Contact 

 

Caution: 

The wire gauge for the terminal block should range between 12 ~ 24 AWG. 

If only using one power source, jumper Pin 1 to Pin 5 and Pin 2 to Pin 6 to eliminate 

power fault alarm. 

 

Attention: 

Le calibre des fils du bornier doit être compris entre 12 et 24 AWG. 

Si vous n'utilisez qu'une seule source d'alimentation, jumelez les broches 1 à 5 et les 

broches 2 à 6 pour éliminer l'alarme de panne de courant.

 

Grounding Note 

Grounding and wire routing help limit the effects of noise due to electromagnetic interference 

(EMI).  Run  the  ground  connection  from  the  ground  screw  to  the  grounding  surface  prior  to 

connecting devices. The grounding screw symbol is shown blow in Figure 2.12.

 

 

Figure 2.12: Grounding screw symbol 

 

Caution: 

Using a shielded cable achieves better electromagnetic compatibility. 

 

Attention: 

L'utilisation d'un câble blindé permet une meilleure compatibilité 

électromagnétique.

 

Summary of Contents for BG5-1204-SFP Series

Page 1: ...LEONTON BG5 1204 SFP Series BG5 1204 SFP BG5 1204 SFP T User Manual...

Page 2: ...t not limited to the implied warranties of merchantability and fitness for a particular purpose Leonton Technologies Co Ltd may make improvements and or changes to the product and or specifications of...

Page 3: ...he grantee of this device could void the user s authority to operate the equipment D claration FCC Cet quipement a t test et reconnu conforme aux limites de la classe A pour les quipements num riques...

Page 4: ...equired to take adequate measures CE Mark Avertissement Ceci est un produit de classe A Dans un environnement domestique ce produit peut tre utilis en pr sence d interf rences radio This document is t...

Page 5: ...View 4 LED Indicators 5 PoE Port LED Indicators 7 PoE Dip Switch 9 Relay Contact Alarm Warning 9 Ethernet Ports 10 Cabling 11 Wiring the Power Inputs 13 Wiring the Fault Alarm Contact 14 Grounding No...

Page 6: ...h a wide operating temperature of 40 to 75 C this series is designed to meet any needs for industrial automation outdoor application and harsh environments Key Features Interface Performance All Coppe...

Page 7: ...iser un dispositif de protection sur l entr e d alimentation Fourniture par courant industriel homologu UL Les sp cifications mat rielles les ports les informations de c blage et l installation du c b...

Page 8: ...3 Hardware Description Physical Dimensions Figure 2 1 below shows the physical dimensions of BG5 1204 SFP series W x H x D is 54mm x 142mm x 99mm Figure 2 1 Physical Dimensions...

Page 9: ...he BG5 1204 SFP series switch that is equipped with one 6 pin removal terminal block connector for dual DC power inputs 48 55VDC Figure 2 3 Top Panel View LED Indicator Console Port USB Port Reset But...

Page 10: ...ftware setting MASTER Green On ERPS Owner Mode Ring Master is ready Off ERPS Owner Mode is not active RING Green On ERPS Ring Network is active and works well Flashing ERPS Ring works abnormally or mi...

Page 11: ...Flashing The port is trying to recover from event failure Frequency 20secs time at PoE Mode Port 5 8 Copper Lower LED Amber On Supplying PoE at 30w af power to the powered device Off Not connected to...

Page 12: ...ority PoE port will be shutdown The PoE LED of the port will act cyclically as below until the port is recovered from the event After the PoE port is recovered from the PoE budget overload event the P...

Page 13: ...the PoE LED of the port will act cyclically as below until the event indicator is clear manually AF AT Amber BT Green Dual PD Fail Event When one channel of the connected dual PD is failed the PoE po...

Page 14: ...1 24VDC 1A resistive normal open on 6 pin terminal block The relay contact alarm will be triggered when anyone of the pre configured events occurs User can configure the event warning for the events...

Page 15: ...traight Through Cable Pin Number Signal Pin Number Signal Pin Number Signal Pin Number Signal 1 RX 3 TX 1 RX 1 TX 2 RX 6 TX 2 RX 2 TX 3 TX 1 RX 3 TX 3 RX 6 TX 2 RX 6 TX 6 RX Table 2 2 1000BASE T RJ 45...

Page 16: ...that complies with IEC 60825 1 and classified as Class 1 laser product Attention Veuillez utiliser un metteur r cepteur optique SFP conforme la norme CEI 60825 1 et class comme produit laser de classe...

Page 17: ...shown below Step 1 Press the upper side of the LC connector from the transceiver and pull it out to release as shown below in Figure 2 7 Figure 2 7 Remove LC Connector Step 2 Push down the metal clasp...

Page 18: ...tor as shown below in Figure 2 9 Figure 2 9 Power Terminal Block Step 2 Tighten the wire clamp screws to prevent the wires from loosening as shown below in Figure 2 10 Figure 2 10 Power Terminal Block...

Page 19: ...n 1 to Pin 5 and Pin 2 to Pin 6 to eliminate power fault alarm Attention Le calibre des fils du bornier doit tre compris entre 12 et 24 AWG Si vous n utilisez qu une seule source d alimentation jumele...

Page 20: ...ure 3 1 The Rear Side of the Switch and DIN Rail Bracket Follow the steps below to learn how to hang the industrial Ethernet switch Step 1 Use the screws to install the DIN Rail bracket on the rear si...

Page 21: ...ull down the bracket on to the rail as shown below in Figure 3 3 Figure 3 3 Stable the Switch on DIN Rail Step 5 Check if the bracket is mounted tightly on the rail Step 6 To remove the industrial Eth...

Page 22: ...strial Ethernet switch Step 3 Use the screws to screw the wall mounting bracket on the industrial Ethernet switch Step 4 Use the hook holes at the corners of the wall mounting bracket to hang the indu...

Page 23: ...Wiring the Power Inputs section Please refer to the LED Indicators section for LED light indication Step 5 Prepare the twisted pair straight through category 5 cable for Ethernet connection Step 6 Ins...

Page 24: ...st me int grant l quipement est de la responsabilit de l assembleur du syst me Caution This is an OPEN TYPE module and should be installed in a final safety enclosure characteristic Attention Il s agi...

Page 25: ...which help to identity if any problems exist Please refer to the LED Indicators section for LED light indication If the power indicator LED does not turn on when the power cord is plugged in the user...

Reviews: