Hardware Installation 

Installation Steps 

This section will explain how to install PG2-1002-10GSFP series.

 

 

Installation Steps

 

Step 1. 

Unpack the industrial Ethernet switch from the original packing box.

 

Step 2. 

Check if the DIN-Rail bracket is screwed on the industrial Ethernet switch.

 

 

If the DIN-Rail is not screwed on the industrial Ethernet switch, please refer to the 

DIN-Rail 

Mounting

 section for DIN-Rail installation.

 

 

If you want to wall mount the industrial Ethernet switch, please refer to the 

Wall Mounting

 

section for wall mounting installation.

 

Step 3. 

To hang the industrial Ethernet switch on a DIN-Rail or wall, please refer to the 

Mounting 

Installation

 section.

 

Step 4. 

Power on the industrial Ethernet switch and then the power LED light will turn on.

 

 

If you need help on how to wire power, please refer to the 

Wiring the Power Inputs

 section.

 

 

Please refer to the 

LED Indicators

 section for LED light indication.

 

Step 5. 

Prepare the twisted-pair, straight-through category 5 cable for Ethernet connection.

 

Step 6. 

Insert one side of the RJ-45 cable int

o switch’s Ethernet port and on the other side into 

the networking device’s Ethernet port, e.g. switch PC or server. The Ethernet port’s (RJ

-45) 

LED  on  the  industrial  Ethernet  switch  will  turn  on  when  the  cable  is  connected  to  the 

networking device.

 

 

Please refer to the 

LED Indicators

 section for LED light indication.

 

Step 7. 

When  all  connections  are  set  and  the  LED  lights  all  show  normal,  the  installation  is 

complete.

 

Summary of Contents for PG2-1002-10GSFP Series

Page 1: ...LEONTON PG2 1002 10GSFP Series User Manual...

Page 2: ...t not limited to the implied warranties of merchantability and fitness for a particular purpose Leonton Technologies Co Ltd may make improvements and or changes to the product and or specifications of...

Page 3: ...equipment D claration FCC Cet quipement a t test et reconnu conforme aux limites de la classe A pour les quipements num riques conform ment la section 15 des R glementations FCC Ces limites sont con u...

Page 4: ...equired to take adequate measures CE Mark AVERTISSEMENT Ceci est un produit de classe A Dans un environnement domestique ce produit peut tre utilis en pr sence d interf rences radio This document is t...

Page 5: ...ption 3 Physical Dimensions 3 Front Panel 4 Top View 4 LED Indicators 5 Ethernet Ports 6 Cabling 7 Wiring the Power Inputs 9 Wiring the Fault Alarm Contact 10 Mounting Installation 11 DIN Rail Mountin...

Page 6: ...ndustrial automation application and harsh environments Key Features Interface Performance All Copper ports support auto MDI MDI X function PG2 1002 10GSFP Embedded 8 10 100 1000Tx with PoE PSE 30W Po...

Page 7: ...industrial Ethernet switch s hardware specs ports cabling information and wiring installation will be described within this user manual ATTENTION Si la tension CC est fournie par un circuit externe v...

Page 8: ...3 Hardware Description Physical Dimensions Figure 2 1 below shows the physical dimensions 54mm W x 142mm H x 99mm D Figure 2 1 Physical Dimensions...

Page 9: ...naged Ethernet switch is shown below in Figure 2 2 Figure 2 2 The Front Panel Top View Figure 2 3 below shows the top panel of the PG2 1002 10GSFP series switches that is equipped with one 6 pin remov...

Page 10: ...nput 1 is inactive P2 Green On Power input 2 is active Off Power input 2 is inactive FAULT Red On Power input 1 or 2 is inactive Off Power input 1 and 2 is active L A LAN Port 1 8 Green On Connected t...

Page 11: ...raight Through Cable Pin Number Signal Pin Number Signal Pin Number Signal Pin Number Signal 1 RX 3 TX 1 RX 1 TX 2 RX 6 TX 2 RX 2 TX 3 TX 1 RX 3 TX 3 RX 6 TX 2 RX 6 TX 6 RX Table 2 2 1000BASE T RJ 45...

Page 12: ...se employ optional optical transceiver SFP that complies with IEC 60825 1 and classified as Class 1 laser product Attention Veuillez utiliser un metteur r cepteur optique SFP conforme la norme CEI 608...

Page 13: ...ctor from the transceiver please follow the steps shown below Step 1 Press the upper side of the LC connector from the transceiver and pull it out to release as shown below in Figure 2 7 Figure 2 7 Re...

Page 14: ...nnector as shown below in Figure 2 9 Figure 2 9 Power Terminal Block Step 2 Tighten the wire clamp screws to prevent the wires from loosening as shown below in Figure 2 10 Figure 2 10 Power Terminal B...

Page 15: ...application example for the fault alarm contact is shown below in Figure 2 11 Figure 2 11 Wiring the Fault Alarm Contact Caution The wire gauge for the terminal block should range between 12 24 AWG If...

Page 16: ...ure 3 1 The Rear Side of the Switch and DIN Rail Bracket Follow the steps below to learn how to hang the industrial Ethernet switch Step 1 Use the screws to install the DIN Rail bracket on the rear si...

Page 17: ...ull down the bracket on to the rail as shown below in Figure 3 3 Figure 3 3 Stable the Switch on DIN Rail Step 5 Check if the bracket is mounted tightly on the rail Step 6 To remove the industrial Eth...

Page 18: ...ttom of the industrial Ethernet switch Step 3 Use the screws to screw the wall mounting bracket on the industrial Ethernet switch Step 4 Use the hook holes at the corners of the wall mounting bracket...

Page 19: ...to the Mounting Installation section Step 4 Power on the industrial Ethernet switch and then the power LED light will turn on If you need help on how to wire power please refer to the Wiring the Powe...

Page 20: ...assist in identifying problems the switch can be easily monitored with the LED indicators which help to identity if any problems exist Please refer to the LED Indicators section for LED light indicat...

Reviews: